Excavation & Fill Dirt Calculator

Work out exactly how much dirt a dig moves — bank yards in the ground, loose yards in the truck, compacted yards in the fill — with the swell factor for your soil, truckloads and weight.

Calculate your excavation

Units:

Swell and shrink come from the Federal Highway Administration’s earthwork table (Exhibit 5.1 A): dirt takes up more room once it is dug, and less room once it is compacted back into a fill. Caterpillar’s table gives different numbers for the same soil (topsoil 43% swell, not 56%) — the FHWA figures are used here, and the range is noted below. For a round hole, enter the diameter as the length (width is ignored). Before you dig, call 811 (US) to mark buried utilities.

Your results

–
bank cubic yards
–
loose cubic yards
–
truckloads
–
weight (tons)

How excavation volume works

Every dirt job involves the same pile of soil measured three different ways, and quoting the wrong one is the most common way estimates fall apart.

Bank cubic yards (BCY): length × width × depth ÷ 27 — the soil as it sits in the ground, what the plan shows

Loose cubic yards (LCY): bank × (1 + swell %) — the same dirt after digging, what fills the trucks

Compacted cubic yards (CCY): bank × (1 + compacted change %) — what loose soil shrinks back to when re-placed and compacted

Fill: bank yards to buy = compacted fill ÷ (1 + compacted change %)

Truckloads: loose yards ÷ truck capacity, rounded up

Weight: bank yards × 1.35 tons (moist earth, about 2,700 lb per bank yard)

The swell and shrink factors are the Federal Highway Administration’s Federal Lands earthwork table (Exhibit 5.1 A): topsoil +56% / −26%, clay dry +50% / −10%, earth and loam dry +50% / −12%, sand dry +11% / −11%, gravel +20% / −8%, shale +79% / +49%, limestone +63% / +36%. Caterpillar’s table gives different numbers for the same soil (topsoil 43% swell, earth and loam 23–25%), and the FHWA itself says its factors vary ±33% — so treat these as planning figures and confirm with a geotechnical test for a big job. The worked example matches Muthler Landscaping’s cut-and-fill calculator: a 40 × 30 ft area 1 ft deep in earth loam is 44.4 bank yards, 66.7 loose and 39.1 compacted, 7 loads at 10 yards.

Worked example

A pit 20 × 15 ft, 4 ft deep, earth / loam, dry:

Bank: 20 × 15 × 4 ÷ 27 = 44.44 yd³

Loose: 44.44 × 1.50 = 66.67 yd³

Compacted: 44.44 × 0.88 = 39.11 yd³

Truckloads: 66.67 ÷ 10 = 7 loads

Weight: 44.44 × 1.35 = 60.0 tons

The same hole as a fill needs 44.44 compacted yards — so you buy 44.44 ÷ 0.88 = 50.51 bank yards, haul 50.51 × 1.50 = 75.76 loose yards in 8 loads, weighing 68.2 tons. A round hole 10 ft across, 4 ft deep, in dry sand is 314 cu ft — 11.64 bank yards, 12.92 loose yards, 2 loads, 15.7 tons.

How much does excavation cost? (US, 2026)

Excavation is priced by the job, not by a catalogue rate — access, soil, depth, haul distance and dump fees move the price more than the volume does. Enter your quoted rates above and this page totals them. These are the numbers that decide the bill:

Cost driverWhat to ask for
Digging (machine + operator)Quoted per bank cubic yard, or per hour
HaulingQuoted per load, by truck size and distance
Dump / tipping feeQuoted per load, by material and site
Truck sizesPickup ~1 yd³ · single-axle 10 yd³ · tandem 10–14 yd³ · tri-axle ~20 yd³
Weight limitA 10 yd³ load of wet clay can top 15 tons — trucks cap on weight before volume

Waste allowance

There is no waste % on this page, because swell is the allowance: the loose yards are already 11–79% more than the bank yards, depending on the soil. Do not multiply bank yards by swell and then add a waste buffer on top — you would be double-counting. If the soil is wet, root-filled or rocky, use the high end of the swell range instead.

Frequently asked questions

What is the difference between bank, loose and compacted yards?

Bank yards (BCY) are the soil in the ground, what the plan shows. Loose yards (LCY) are what those bank yards become after digging — the soil fluffs up and takes more room, and that is what fills the trucks. Compacted yards (CCY) are what loose soil shrinks back to when it is re-placed and compacted, typically about 80% of its loose volume.

How much does dirt swell when you dig it?

It depends on the soil (FHWA table): topsoil +56%, clay +50%, earth and loam +50%, sand +11%, gravel +20%, shale +79% and limestone +63%. Caterpillar’s table gives lower numbers for the same soils, so treat these as planning figures — the FHWA itself says its factors vary ±33%.

How many truckloads of dirt is 44 cubic yards?

It depends on the swell and the truck. A 44.4 bank-yard dig in earth loam becomes 66.7 loose yards, which is 7 loads in a 10 yd³ truck, 5 loads in a 14 yd³ tandem, or 4 loads in a 20 yd³ tri-axle. Always divide the loose yards, not the bank yards, by the truck size.

How much does a cubic yard of dirt weigh?

About 2,700 lb (1.35 tons) per bank cubic yard of moist earth. Dry sand is lighter, wet clay is heavier — a 10 yd³ load of wet clay can top 15 tons, which is why trucks cap on weight before volume.

Can I reuse excavated dirt as fill?

Yes — but it compacts to less than you dug. Earth loam compacts to 88% of its bank volume, so a 44.4 yd³ hole needs 50.5 bank yards of fill, hauled as 75.8 loose yards. Topsoil compacts to 74%, so it is a poor fill material: use it as the top layer, not the fill.